Tuesday, August 21, 2007
All Girders are now set. Winterset spent the day finishing installing the cross braces, torqueing bolts and forming abutment two backwall.
Installing Conduit for Verizon phone lines and drainage on the south end of the bridge. Note the Manhole on the right. Sewer crosses under the conduit and drainage here. Also, an 8" water line crosses under both just a few feet south of the sewer line. It connects to a 12" water line on the other side of the road in this area.