Abutment Two was poured up to within 8' of the Bottom of the steel beams this week. About 150 cy of concrete.
Winterset worked on Subbase of crushed stone, the roadway base for Prince Street down on the lower end. They used the excavated material from the roadway to build a crane pad for unloading the steel beams that will arrive in the third week of August.