Winterset continues to excavate the inner part of
Prince Street. Drainage from main street will
discharge into this settling area inside the curve
of the road. From there an outlet pipe will drain the
water the rest of the way to the river.
Forming the retaining wall that will be along
the side of the driveway that we had to raise
along with raising the north end of the bridge.
Friday, November 9, 2007
Remove the Maybe bridge